how to manage hospital waste

Incinerator Equipment Performance Requirements The principal activities of the Contract are the supply, install, commissioning and operations training. The required standards for the Contract activities are set out in the following Scope of Works below. The required minimum performance criteria for the incinerator to be provided by the bidder(s) is set out in this section. … Read more

TECHNICAL SPECIFICATIONS FOR INCINERATOR– 50 KGS/HR

1. Brand Type & Model,Indicate •Mixed general, clinical and incinerable hazardous wastes with a wide range of calorific values and densities. The majority of the wastes will be of bio medical nature, with up to 70% by volume of medical wastes and up to 30% by volume of hazardous and or general wastes. The content … Read more

PLC based control box for incinerator

i.   Circular Mild Steel / Stainless steel with minimum thickness 3mm, self-supported flange section chimney and should have suitable door/window at the base for cleaning. ii. Proper port for taking exhaust gases sample to monitor emission levels as per international standards provided with a cover to be opened and closed when needed without affecting the … Read more

HOSPITAL WASTE INCINERATOR incineration Secondary Chamberincineration Secondary Chamber

According  to   the   European Waste   Incineration Directive, incineration Secondary Chambermust be designed to ensure that the flue gases reach a temperature of at least 1100 °C for 2 seconds in order to ensure proper breakdown of toxic organic substances. ii. Blower Centrifugal fan (according to manufacturer design) will be provided to inject air for burning … Read more

Medical Waste Incineration and Medical Incinerators

1. Burning Capacity i. Incinerator should be capable to burn waste @ 100 kg / hr in single loading. 2. Construction i.   Packaged type skid mounted dual chamber construction ii. Stainless steel or Mild steel outer with thickness 5mm or more, sheet should be painted with heat resistant and anti-corrosive paint. iii. Internal surface of incinerator should be line with non– cracking refractory bricks made of ceramics or concrete to withstand the temperature of 1400 oC, furthermore bricks must be backed by thermal insulation and have thickness in between 220C250 mm. iv. There should be thermal insulation of high performance calcium silicate (Density 230Kg.m-3)to withstand high temperature with flame spread/smoke index not more than 1. v. Refractory and thermal insulation must be designed in robust way so that outer temperature on sheet does not rise above 55– 60 oC even after continuous operation of 12 hours. 3. Primary Chamber i. Chamber be designed with capacity to load 100kg medical waste with volume at least 1.2m3 or more, chamber must have separate door for loading of waste and for removal of ash using manual ash removing tool. ii. Pyrolytic burning mechanism with burning temperature not below than 900 oC. iii. Blower Centrifugal fan (according to manufacturer design) will be provided to inject air for burning waste and gases in primary combustion chamber furthermore air  regulation and distribution will be automatic and electronically controlled. iv.  Chamber should have electrically operated natural gas burner. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com   … Read more

HOSPITAL WASTE INCINERATOR hospital waste management system

Incinerator (hospital waste management system) is a turn-key project which will comprise a  hospital grade incinerator, allied accessories and operation for proper disposal of hospital General medical waste (plastics, gloves and papers) and Infectious waste (blood-soaked bandages, sharps waste, surgical waste, human or body parts, cultures, and swabs).the unit should be of high performance to … Read more

discuss the design and operation or various types of incinerators

The proposed incinerators shall be able to be completely packed into a series of 20ft export standard sea containers. Incinerators must  be able to support different power sources (PV solar system , diesel Electric generator , local or  compound mini-scale grid) All electrical connections attached with the incinerator and other machinery should be provided with … Read more

clinical waste treatment 5kgs 10kgs 20kgs and 30kgs per hour average

The Incinerator units shall be designed to last in operation in a tropical environment for a minimum period of 10 years if the specified maintenance schedule is followed. All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion The incinerator combustion chamber(s) … Read more

HICLOVER Mobile Containerized Incinerators

a. be based on common, well-proven and clean technology – both as a complete unit and in terms of its individual components. b. be very robust, sturdy and capable of installation in remote locations subject to severe conditions. d. generate residual incinerator ash conforming to <10% by volume and <25% by weight of the waste … Read more

DOMESTIC INCINERATOR, YD 300 Spare Parts for Waste Incinerators and Burners

  incineradores de residuos para fabricantes de uso general y municipal en paraguay concept of incinerator machine     Ceramic filter candle 1mtr Filter-Candle Sick sensor encoder BCG13-L1KM05PP LID REPAIR KIT I8-1000 I8-1000 Lid Repair Kit SS Chimney SS Chimney SS Chimney extension SS Chimney extension SS Chimney Cowl SS Chimney Cowl Refractory cement CA50-A600 Asbestos rope 20425159188 Ignition transformer-secondary burner EB14HPM Ignition transformer-Primary burner 26-48-3371T Emergency push button … Read more